Time | Paper ID | Title / Authors | Keywords | Topic code | Ack. number |
---|---|---|---|---|---|
Symposium <Recent Research and Development of Process Systems Engineering> | |||||
(9:00–10:00) (Chair: Baba K.) | |||||
J201 | Development of Simulator for Bio-Propylene Synthesis Process | Bio-Ethanol Propylene Reaction Rate Constant | S-39 | 23 | |
J202 | Non-linear data visualization and networks combined approach for monitoring of process data | Process Monitoring Generative Topographic Mapping Graph Theory | S-39 | 304 | |
J203 | Adaptive soft sensor method based on moving window model and ensemble learning | soft sensor adaptive model ensemble learning | S-39 | 29 | |
(10:00–11:00) (Chair: Hamaguchi T.) | |||||
J204 | Regression model for the monitoring of a process plant | process monitoring regression model | S-39 | 180 | |
J205 | Database management method based on distance and non-linearity for locally weighted linear regression model | Database management Soft-sensor Non-linearity | S-39 | 434 | |
J206 | Efficient wavenumber selection method for NIR calibration modeling and its application to pharmaceutical processes | Process analytical technology Near infrared spectroscopy Input variable selection | S-39 | 31 | |
(11:00–11:40) (Chair: Kaneko H.) | |||||
J207 | Improving Lead Time of Pharmaceutical Production Processes Using Monte-Carlo Simulation | Scheduling Supply chain Sensitivity analysis | S-39 | 800 | |
J208 | Robust Optimal Intermediate Temperature Control for Seeded Batch Crystallization | batch process control crystallization optimization | S-39 | 621 | |
(13:20–13:40) (Chair: Kaneko H.) | |||||
J214 | A study on a BPM for an alarm system design process based on a plant and an alarm management lifecycle | plant lifecycle alarm management lifecycle business process model | S-39 | 418 | |
(13:40–14:40) (Chair: Tonomura O.) | |||||
J215 | Grouping of Sequential Alarms in Plant Operation Data based on Dot Matrix Analysis | Sequential Alarms Plant Alarm System Dot Matrix Analysis | S-39 | 47 | |
J216 | Estimation of processing completion time and critical path in manufacturing systems under consideration of interaction between parallel process paths | estimation of processing completion time critical path stochastic processing time | S-39 | 866 | |
J217 | Improvement of the diversity of Pareto solutions in multi-objective ACO | ant colony optimization multi-objective traveling salesman problem diversity of Pareto solutions | S-39 | 862 | |
(14:40–15:40) (Chair: Noda M.) | |||||
J218 | Modeling and control of abnormal behaviors of discrete event system | fault detection fault avoidance control discrete event system | S-39 | 865 | |
J219 | Study of the automatic R&D system using bio-inspired algorithms for chemical vapor deposition processes | bio-inspired algorithms chemical vapor deposition research and development | S-39 | 966 | |
J220 | Development and evaluation of the algorithms to estimate deposition profiles of CVD using GAs (3) | genetic algorithms chemical vapor deposition growth rate | S-39 | 972 |