Time | Paper ID | Title / Authors | Keywords | Topic code | Ack. number |
---|---|---|---|---|---|
Hall W, Day 1 | |||||
W101 | Actual Application Examples of Mixing Technology Development in Gas-Liquid Mixing | gas-liquid mixing mixing impeller simulation | P-1 | 78 | |
W102 | Solutions for Various Kinds of Problems by Mixing Technology | mixing Hi-F mixer | P-1 | 81 | |
W103 | SUMITOMO's Impeller Line-up (Sumitomo Heavy Industries Process Equipment) *Maeda N., | mixing impeller high share gas absorption | P-1 | 84 | |
W104 | Development of a Novel Type of Wall Wetter | mixing heat transfer splash | P-1 | 87 | |
W105 | Design Guideline of Stirred Tank Reactor (Mainly in Impeller and Baffle) | mixing mixing impeller baffle | P-1 | 88 | |
W106 | Mixing Performance Evaluation and Keypoint of Large Paddle Impellers | large paddle impeller power consumption streak line | P-1 | 92 | |
W107 | Improvement of Reactivity in a Gas-Liquid Agitating Vessel Under High Gas Flow Rate Condition | gas-liquid agitation high gas flow rate shear-force agitating impeller | P-1 | 79 | |
W108 | Eccentric Mixing Using Large-Type Impeller | eccentric mixing large-type impeller mixing | P-1 | 90 | |
W109 | Influence of the Blades Geometry in an Agitating Mixer by DEM Simulation | DEM simulation segregation design | P-1 | 80 | |
W110 | Study on the Mixing Behavior of Particle in Fluidized Bed | fluidized bed powder mixing quantitative method | P-1 | 82 | |
W111 | Examples of Scale-up of Stirred Reactors Using Flow Analysis | mixing scale-up | P-1 | 83 | |
W112 | CFD Application for Mixing Vessels in Commercial Chemical Processes | CFD mixing | P-1 | 85 | |
W113 | Numerical Analysis of Mixing Flow using Particle Method | CFD MPS method scaleup | P-1 | 137 | |
W120 | Chemical Process Safety to Learn to Case (machine translation) | P-2 | 126 | ||
W121 | Human Error and Safety | safety engineering human factor risk management | P-2 | 120 | |
W122 | Safety activity in Soken "Recurrence prevention" & "Risk assessment" | risk assessment electrostatic discharge ocnductive of work floor | P-2 | 124 | |
W123 | Teijin Duupont Film of Safety Activities | daily four-part structure taking in advance disaster report reproduction video of a past disaster | P-2 | 134 | |
W124 | Introducing an SMART Positioner with HART Communication for Deterioration Diagnosis.[for the "planning-led maintenance" ] | adjustment valve diagnosis Instrumentation facilities management HART | P-2 | 125 | |
W125 | "Producing Safety" Safety Management of EAST JAPAN RAILWAY COMPANY | producing safety learn from lesson human error | P-2 | 130 | |
W126 | Bodily Sensation Education by the Inflection of the Ccomputer Graphics (machine translation) | P-2 | 127 | ||
W127 | Resolution of the Problem about High Temperature Degradation in Chemical Plant | equipment material high temperature degradation aging degradation | P-2 | 132 | |
W128 | Improving Managing Technology of Corrosion under Insulation (CUI) of Piping | CUI neutron moisture meter surface temperature | P-2 | 133 | |
W129 | The Latest Water Processing Chemicals for Low-Pressure Boiler (Prevention Technology for Scaling) (machine translation) | scale energy conservation efficiency maintenance | P-2 | 139 | |
W130 | Examples of Deterioration and Damage of FRP Equipment | FRP Deterioration Damage | P-2 | 131 | |
W131 | Technical Support Tool for Gasket Selection and Tightening | gasket | P-2 | 192 | |
W132 | Introduction to Maintenance Technology Subcommittee Activities | facilities maintenance standard operator's maintenance materials deterioration diagnosis technique | P-2 | 193 | |
W133 | Realization of CBM Based on Results of Machine Diagnostics beyond 30 Years! | CBM vibration diagnosis predictive maintenance | P-2 | 140 | |
W134 | Advenced Critical Trend Monitoring for Safety | alarm management future trend autoregressive model | P-2 | 135 | |
W135 | Big Data-Based Early Anomaly Detection System for Instrumentation Device | fuzzy neral network big data abnormal condition management | P-2 | 136 | |
W136 | Control Valve Maintenance Support System with HART/Fieldbus | device managemet control valve condtion monitoring | P-2 | 138 | |
W137 | Improvement of Safety and Security on Petrochemical Plants by Operational Risk Management | functional safety HAZOP IEC61511 | P-2 | 195 | |
W138 | Aggregation of Knowledge and Efficiency of Field | maintenance introduction of IT of check duties technology transfer | P-2 | 196 | |
W139 | Recent Failure Prognostic Methods for Infrastructures and Facilities based on the Machine Learning | sensor data omen detection machine learning | P-2 | 198 | |
W140 | Dynamic Simulation for Plant Safety | dynamic simulation safety | P-2 | 118 | |
W141 | Maintenance Method for High Rotating Divice (Atomizer) | spray dryer spray dryer device maintenance | P-2 | 122 | |
W142 | Activity for Safety and Compliance | repetition education compliance awareness improvement no accident no hazard | P-2 | 128 | |
W143 | Activity Eeport of SCE Net Contributing to Maintenance Improvement of the On-site Power (machine translation) | On-site power evaluation of environment educational support | P-2 | 384 | |
W144 | Fouling Control Program for Open-Recirculating Cooling Water System with Plant to Reduce Operating and Maintenance Cost of the System | energy conservation fouling Security, the consecutive operation of facilities | P-2 | 123 |