Day 1 | |||||
---|---|---|---|---|---|
Time | Paper ID | Title / Authors | Keywords | Topic code | Ack. number |
Symposium <Integration Engineering for Supporting Creation of Superior Scenarios> | |||||
(13:00–14:20) (Chair: Aoyama A., Bito K.) | |||||
I113 | A Scenario Analysis of Energy System Based on Integration Engineering | Technology roadmapping Simulation Workshop | S-40 | 730 | |
I115 | Challenges in the Pharmaceutical Industry and Creating Countermeasure Scenarios Using Integration Engineering | Pharmaceutical industry Process systems engineering Systems approach | S-40 | 420 | |
(14:20–15:40) (Chair: Shimada Y., Yamaguchi H.) | |||||
I117 | Integration Engineering for the Pharmaceutical Industry: Efficient Maintenance System of NIR Calibration Model Using IDEF0 | Business process modeling Near infrared spectroscopy Model maintenance | S-40 | 734 | |
I119 | Requirements Specification of Process Chemistry for Batch Processes | Process chemistry Batch process Recipe design | S-40 | 473 | |
(15:40–16:20) (Chair: Sugiyama H.) | |||||
General discussion | |||||
Day 2 | |||||
Time | Paper ID | Title / Authors | Keywords | Topic code | Ack. number |
Symposium <The Subjects and Approaches to Process Safety Management> | |||||
(9:00–11:40) (Chair: Iuchi K., Aoyama A.) | |||||
I201 | Approach to Metrics for Management of Safety | Management of Safety Metrics | S-12 | 416 | |
I202 | Principles and Procedures of Metrics Development from Incident Investigation | Process Safety management Process Safety Metrics Incident Investigation | S-12 | 144 | |
I204 | Application of Metrics to Chemical Process Plant's Accidents | Process Safety Management Lagging Metrics Leading Metrics | S-12 | 93 | |
I205 | Process Safety Leading Metrics based on Incident Investigation by applying Business Process Model | Process Safety Management Leading Metrics Business Process Model | S-12 | 471 | |
I207 | Incident Investigation for Process Safety Metrics based on Business Process Model | Business Process Model Incident Investigation Process Safety Metrics | S-12 | 466 | |
(13:20–14:20) (Chair: Shimada Y.) | |||||
I214 | Development of Business Process Model for Plant Maintenance | Plant Maintenance Business Process Model IDEF0 | S-12 | 461 | |
I215 | Application of Plant Maintenance Supporting Environment | Plant Maintenance Business Process Model Supporting Environment | S-12 | 462 | |
I216 | Engineering Activity Model Based Requirements Specification of Process Chemistry | Process Chemistry Technology Transfer Engineering Activity Model | S-12 | 951 | |
(14:20–15:40) (Chair: Minagawa T.) | |||||
I217 | Application of Chemical Process Plant's Accidents | Process Safety Management Progress Flow Analysis Accident | S-12 | 92 | |
I218 | Disemmination of risk management methodologies for the small-and-medium-sized enterprises in the chemical process industries | Risk Assessment Risk Control Process Safety Management | S-12 | 294 | |
I219 | Safety Culture in Process Safety | Process Safety Safety Culture Chemical Process | S-12 | 550 | |
I220 | A study on the consequence evaluation of the flamable liquid spills on the sea | Liquefied Natural Gas Consequence analysis Underwater spill modelling | S-12 | 690 |